<?xml version="1.0" encoding="UTF-8"?>
<doi_batch version="4.3.0" xmlns="http://www.crossref.org/doi_resources_schema/4.3.0" xmlns:xsi="http://www.w3.org/2001/XMLSchema-instance" xsi:schemaLocation="http://www.crossref.org/doi_resources_schema/4.3.0 http://www.crossref.org/schema/deposit/doi_resources4.3.0.xsd">
<head>
<doi_batch_id>0c29b135-1d49-426d-b3c1-1ae107551e71</doi_batch_id>
<depositor>
<name>beie</name>
<email_address>director@blueeyesintelligence.org</email_address>
</depositor>
</head>
<body>
<doi_citations>
<doi>10.35940/ijitee.C8414.0110321</doi>
<citation_list><citation key="ref0"><unstructured_citation>Abdelnaser omran,(2010), factors affecting cost performance in construction projects within kelantan state in malaysia, journal of academic research in economics, vol .3 ,no. 1</unstructured_citation></citation><citation key="ref1"><unstructured_citation>Abdelnaser omran1,(2015), determining the factorsaffecting the performance of construction projects in libya, journal of academic research in economics,vol. 7 ,no. 2</unstructured_citation></citation><citation key="ref2"><doi>10.3846/1392-3730.2009.15.269-280</doi><unstructured_citation>Adnan Enshassi1, Sherif Mohamed2,Saleh Abushaban3,(2009),factors affecting the performance of construction projects in the gaza strip, Journal of civil engineering and management,vol .15(3), NO. 269-280</unstructured_citation></citation><citation key="ref3"><doi>10.1142/S1609945106000621</doi><unstructured_citation>Yangchau-ping,(2007), factors affecting the performance of public projects in taiwan, journal of construction research world scientific publishing company, vol. 7, nos. 1&amp;2 (2006) 207-225</unstructured_citation></citation><citation key="ref4"><unstructured_citation>Eleni Moschouli1, Raden Murwantara Soecipto2, Thierry Vanelslander3, (2018), Factors affecting the cost performance of transport infrastructure projects JOURNAL OF EJTIR 18(4), 2018, pp.535-554</unstructured_citation></citation><citation key="ref5"><doi>10.1108/ECAM-03-2016-0062</doi><unstructured_citation>Ephrem Girma Sinesilassie, Syed Zafar Shahid Tabish, Kumar Neeraj Jha (2017), Critical factors affecting schedule performance: a case of Ethiopian public construction projects engineers' perspective</unstructured_citation></citation><citation key="ref6"><doi>10.1016/j.ejor.2006.06.053</doi><unstructured_citation>Chen Shih-Pin, (2007), Analysis of critical paths in a project network with fuzzy ctivity times, European Journal of Operational Research, Vol. 183, PP. 442 -459</unstructured_citation></citation><citation key="ref7"><doi>10.1080/01446190600827033</doi><unstructured_citation>Arshi Shakeel Faridi a , Sameh Monir El‐Sayegh b,(2007), Significant factors causing delay in the UAE construction industry, Construction Management and Economics,VOL .24:11,NO. 1167-1176</unstructured_citation></citation><citation key="ref8"><doi>10.1061/(ASCE)0733-9364(2006)132:8(871)</doi><unstructured_citation>K. C. Iyer1 , K. N. Jha2,(2006), Critical Factors Affecting Schedule Performance:Evidence from Indian Construction Projects, Journal of Construction Engineering and Management,Vol. 132, No. 8</unstructured_citation></citation><citation key="ref9"><unstructured_citation>Saaty, T. L. (1999a). &quot;Basic Theory of the Analytic Hierarchy Process: How to Make A Decision.&quot; Revista de la Real Academia de Ciencias Exactas, Físicas y Naturales, 93(4), 395-423.</unstructured_citation></citation><citation key="ref10"><doi>10.13033/isahp.y2001.028</doi><unstructured_citation>Saaty, T. L. (2001). &quot;Decision Making with the Analytic Network Process (ANP) and Its &quot;Super Decisions&quot; Software: The National Missile Defense (NMD) Example.&quot; 6thISAHP 2001 proceedings, Bern, Switzerland, 2-4.</unstructured_citation></citation><citation key="ref11"><doi>10.1007/s11518-006-0151-5</doi><unstructured_citation>Saaty, T. L. (2004a) &quot;Decision Making - The Analytic Hierarchy and Network Processes (AHP/ANP).&quot; Journal of Systems Science and Systems Engineering, 13(1), 1-35.</unstructured_citation></citation><citation key="ref12"><doi>10.1007/s11518-006-0158-y</doi><unstructured_citation>Saaty, T. L. (2004b) &quot;Fundamentals of the Analytic Network Process-Dependence and Feedback in Decision-Making with a Single Network.&quot; Journal of Systems Science and Systems Engineering, 13(2), 129-157.</unstructured_citation></citation><citation key="ref13"><journal_title>Journal of Systems Science and Systems Engineering</journal_title><author>Saaty</author><volume>14</volume><issue>1</issue><first_page>1</first_page><cYear>2005</cYear><doi>10.1007/s11518-006-0179-6</doi><article_title>Making and Validating Complex Decisions with the AHP/ANP.</article_title><unstructured_citation>Saaty, T. L. (2005) &quot;Making and Validating Complex Decisions with the AHP/ANP.&quot; Journal of Systems Science and Systems Engineering, 14(1), 1-36.</unstructured_citation></citation><citation key="ref14"><doi>10.29020/nybg.ejpam.v1i1.6</doi><unstructured_citation>Saaty, T. L. (2008b) &quot;The Analytic Hierarchy and Analytic Network Measurement Processes: Applications to Decisions under Risk.&quot; European Journal of Pure and Applied Mathematics, 1(1), 122-196.</unstructured_citation></citation><citation key="ref15"><doi>10.1108/13664380680001076</doi><unstructured_citation>S Meeampol, S O Ogunlan,(2006), Factors affecting cost and time performance on highway construction projects: Evidence from Thailand, Journal of Financial Management of Property and Construction,Volume 11, Number 1, pp3 - 20</unstructured_citation></citation><citation key="ref16"><doi>10.1061/(ASCE)0733-9364(2006)132:8(871)</doi><unstructured_citation>K. C. Iyer1 , K. N. Jha2,(2006), Critical Factors Affecting Schedule Performance:Evidence from Indian Construction Projects, Journal of Construction Engineering and Management,Vol. 132, No. 8</unstructured_citation></citation><citation key="ref17"><unstructured_citation>Grigoroudis Evangelos, Litos Charalambos, Moustakis Vassilis A., Politis Yannis and Tsironis Loukas, (2006), The assessment of user-perceived web quality:Application of a satisfaction benchmarking approach, European Journal of Operational Research</unstructured_citation></citation><citation key="ref18"><doi>10.1061/(ASCE)EI.1943-5541.0000013</doi><unstructured_citation>Florence Yean Yng Ling1 and Thi Thuy Dung Bui2,(2010), Factors Affecting Construction Project Outcomes: Case Study of Vietnam, Journal of Professional Issues in Engineering Education and Practice, Vol. 136, No. 3</unstructured_citation></citation><citation key="ref19"><unstructured_citation>Gasiea, Y., Emsley, M., and Mikhailov, L. (2010). &quot;Rural Telecommunications Infrastructure Selection Using the Analytic Network Process.&quot; Journal of Telecommunications and Information Technology, 15-29.</unstructured_citation></citation><citation key="ref20"><journal_title>Automation in construction</journal_title><author>Bobylev</author><volume>20</volume><issue>8</issue><first_page>1030</first_page><cYear>2011</cYear><doi>10.1016/j.autcon.2011.04.004</doi><article_title>Comparative Analysis of Environmental Impacts of Selected Underground Construction Technologies Using the Analytic Network Process.</article_title><unstructured_citation>Bobylev, N. (2011) &quot;Comparative Analysis of Environmental Impacts of Selected Underground Construction Technologies Using the Analytic Network Process.&quot; Automation in construction, 20(8), 1030-1040.</unstructured_citation></citation><citation key="ref21"><unstructured_citation>Topcu, Y. I., and Onar, S. C. (2011) &quot;A Multi-Criteria Decision Model for Urban Mass Transit Systems.&quot; In Proc., Int. Conf. on Computers and Industrial Engineering, Elsevier, Amsterdam, Netherlands, 860-865.</unstructured_citation></citation><citation key="ref22"><unstructured_citation>Saaty, T. L., and Vargas, L. G. (2013a). The Logic of Priorities: Applications of Business, Energy, Health and Transportation, 3rd edition, Springer Science &amp; Business Media., USA.</unstructured_citation></citation><citation key="ref23"><unstructured_citation>Saaty, T. L., and Vargas, L. G. (2013b). Decision Making with the Analytic Network Process: Economic, Political, Social and Technological Applications with Benefits, Opportunities, Costs and Risks, 2nd edition, Springer Science &amp; Business Media, USA.</unstructured_citation></citation><citation key="ref24"><journal_title>&quot; In Handbook of multicriteria analysis Springer Berlin Heidelberg</journal_title><author>Saaty</author><first_page>91</first_page><cYear>2010</cYear><doi>10.1007/978-3-540-92828-7_4</doi><article_title>&quot;The Analytic Hierarchy and Analytic Network Measurement Processes: The Measurement of Intangibles</article_title><unstructured_citation>Saaty, T. L., and Sodenkamp, M. (2010). &quot;The Analytic Hierarchy and Analytic Network Measurement Processes: The Measurement of Intangibles.&quot; In Handbook of multicriteria analysis, Springer Berlin Heidelberg, 91-166.</unstructured_citation></citation><citation key="ref25"><unstructured_citation>Moser, CA, Kalton, G (1971) Survey methods in social investigation. 2nd ed. Aldershot: Dartmouth Publishing.</unstructured_citation></citation><citation key="ref26"><journal_title>&quot; Measuring Business Excellence</journal_title><author>Robinson</author><volume>9</volume><issue>1</issue><first_page>13</first_page><cYear>2005</cYear><doi>10.1108/13683040510588800</doi><article_title>&quot;Business Performance Measurement Practices in Construction Engineering Organisations</article_title><unstructured_citation>Robinson, H. S., Anumba, C. J., Carrillo, P. M., and Al-Ghassani, A. M. (2005). &quot;Business Performance Measurement Practices in Construction Engineering Organisations.&quot; Measuring Business Excellence, 9(1), 13-22.</unstructured_citation></citation></citation_list>
</doi_citations>
</body>
</doi_batch>
