<?xml version="1.0" encoding="UTF-8"?>
<doi_batch version="4.3.0" xmlns="http://www.crossref.org/doi_resources_schema/4.3.0" xmlns:xsi="http://www.w3.org/2001/XMLSchema-instance" xsi:schemaLocation="http://www.crossref.org/doi_resources_schema/4.3.0 http://www.crossref.org/schema/deposit/doi_resources4.3.0.xsd">
<head>
<doi_batch_id>df8bb292-3c75-4a33-83ca-738179c71218</doi_batch_id>
<depositor>
<name>beie</name>
<email_address>director@blueeyesintelligence.org</email_address>
</depositor>
</head>
<body>
<doi_citations>
<doi>10.35940/ijitee.D8503.0510721</doi>
<citation_list><citation key="ref0"><unstructured_citation>Karthik Nagarajan, Raju Narwade, Poonam Tiwari, Heena Pande and Divyashree Yadav (2020): &quot;Automatic Urban Road Extraction from High-Resolution Satellite Data Using Object-Based Image Analysis: A Fuzzy Classification Approach&quot;, Journal of Remote Sensing &amp; GIS, (Dec-2019), ISSN: 2469-4134, Volume-09, Issue-4,pp-1-8, (Aug 2020). DOI:10.35248/2469-4134.20.9.279</unstructured_citation></citation><citation key="ref1"><doi>10.34218/IJCIET.11.5.2020.001</doi><unstructured_citation>Karthik Nagarajan, Raju Narwade and Shrenik Shah (2020): &quot;Assessment Of Urban Utilities For Mumbai City Using 3d Modeling Techniques&quot;, International Journal of Civil Engineering and Technology (IJCIET), (May 2020) ISSN Print: 0976-6308 and ISSN Online: 0976-6316, Volume-11, Issue-5</unstructured_citation></citation><citation key="ref2"><unstructured_citation>Karthik Nagarajan, Raju Narwade and Panaskar S (2019): &quot;Analysis of Changes in LULC of Western Ghat by Comparing NDVI and NDWI &quot; Journal of Remote Sensing &amp; GIS, (Dec-2019), ISSN: 2469-4134, Vol-08, Issue-04, pp:01-07, DOI :</unstructured_citation></citation><citation key="ref3"><unstructured_citation>Karthik Nagarajan, Raju Narwade and Arya Vijayan (2019): &quot;Real-Time Water Leakage Monitoring System Using IoT Based Architecture &quot; International Journal for Research in Engineering Application &amp; Management (IJREAM), (Nov-2019), ISSN: 2454-9150, Vol-05, Issue-08, pp.24-30.</unstructured_citation></citation><citation key="ref4"><unstructured_citation>Karthik Nagarajan, Raju Narwade, Biradar Shilpa, Prof. Gayatri Deshpande,(2019): &quot;E-Waste: An Alternative to Partial Replacement of Coarse Aggregate in Concrete &quot;, International Journal Of Engineering Research &amp; Technology (IJERT), (July-2019) ISSN: 2278-0181, Volume 08, Issue 07 (July 2019), pp.993-999</unstructured_citation></citation><citation key="ref5"><doi>10.35940/ijitee.I8632.078919</doi><unstructured_citation>Karthik Nagarajan, RajuNarwade and Chowdary Mohanlal (2019): &quot;Applications of 4D GIS Model in Construction Management &quot;, International Journal of Innovative Technology and Exploring Engineering (IJITEE), (July-2019) ISSN: 2278-3075, Volume-8 Issue-9, July 2019, pp.2597-2608</unstructured_citation></citation><citation key="ref6"><doi>10.19101/IJATEE.2019.650043</doi><unstructured_citation>Karthik Nagarajan, Raju Narwade, Tejaswini D. N., Mahesh S. Singh (2019): &quot;Factors affecting the labor productivity of brickwork and analyzing them using RII method &quot; International Journal of Advanced Technology and Engineering Exploration, (IJATEE), (May-2019), ISSN (Print): 2394-5443 ISSN (Online): 2394-7454, Vol-06, Issue-54, pp.143-151.</unstructured_citation></citation><citation key="ref7"><unstructured_citation>Karthik Nagarajan, Raju Narwade and Pallavi Patil (2019): &quot; Resource Management of Infrastructural Project for Future Cities: A Re Modified Minimum Moment method &quot; International Journal of Management, Technology And Engineering (IJMTE), (Feb-2019), ISSN NO: 2249-7455, Vol:9, Issue:2, pp.1094-1099</unstructured_citation></citation><citation key="ref8"><unstructured_citation>Karthik Nagarajan, Raju Narwade and Shobana Jadhav (2019): &quot;Best Feasible Transportation ), Route Analysis for Delivering Ready Mixed Concrete (RMC) - A Geographic Information System (GIS) Approach &quot; International Research Journal of Engineering and Technology (IRJET)&quot;, (Feb-2019) Vol:6, Issue:2, e-ISSN: 2395-0056, p-ISSN: 2395-0072, pp.2401-2405</unstructured_citation></citation><citation key="ref9"><unstructured_citation>Karthik Nagarajan, RajuNarwade and Aditya Shatri (2019): &quot;Integrated Land-Use Zoning, Using Topographical Data: Optimizing Vacant Space For Urbanization At Akole Taluka, Maharashtra, India &quot; International Journal of Advanced Research in Engineering and Technology (IJARET), Volume 10, Issue 1, ( Jan-Feb 2019 ), pp. 188-199, IAEME Publication, Article ID: IJARET_10_01_018, Print: 0976-6480 and ISSN Online: 0976-6499</unstructured_citation></citation><citation key="ref10"><unstructured_citation>Karthik Nagarajan and Shrikant Charhate (2016): &quot;Smart Modal Analysis of Multistoried Building Considering the Effect of Infill Walls.&quot;, International Journal of Global Technology Initiatives(IJGTI) 5.1 (March 2016), Vol:5, Issue:1,p-ISSN: 2277-6591,e-ISSN: 2320-1207 pp.C20-C27.</unstructured_citation></citation><citation key="ref11"><doi>10.1061/(ASCE)EI.1943-5541.0000257</doi><unstructured_citation>V.K. Bansal,&quot; Potential application areas of GIS in preconstruction planning,&quot; Technical note, Journal of professional issues in engineering education and practice, 2015, 1-7.</unstructured_citation></citation><citation key="ref12"><unstructured_citation>S. Bhandari, D. Bhandari, and M. Kumari,&quot;Application of geographical information system in progress monitoring of construction project,&quot; International Journal of Scientific &amp; Engineering Research, 2013, 4(12), 100-107.</unstructured_citation></citation><citation key="ref13"><unstructured_citation>K.T. Chang, Introduction to Geographic Information Systems, Tata McGraw-Hill, 2006, New Delhi, India.</unstructured_citation></citation><citation key="ref14"><doi>10.1061/(ASCE)0733-9364(1996)122:4(329)</doi><unstructured_citation>M.Y. Cheng, and O'Connor,&quot; ArcSite: Enhanced GIS for construction site layout,&quot; Journal of Construction Engineering and Management, 1996, 329-336.</unstructured_citation></citation><citation key="ref15"><doi>10.1007/s13369-015-2006-1</doi><unstructured_citation>M. Ebrahim, I. Mosly and I. Elhafez,&quot; Building construction information system using GIS,&quot; Arab Journal of Science and Engineering, 2015, 41: 3827-3840.</unstructured_citation></citation><citation key="ref16"><doi>10.1061/(ASCE)0733-9364(2000)126:4(251)</doi><unstructured_citation>M. Fischer and Bonsang Koo, &quot;Feasibility Study of 4D CAD in Commercial Construction.&quot; Journal of Construction Engineering and Management, Vol 126, Issue 4-July 2000.</unstructured_citation></citation><citation key="ref17"><unstructured_citation>M. Fischer and F. Aalami, &quot;Cost loaded production model for planning and control.&quot; Construction Informatics Digital Library, paper w78-1999-2813</unstructured_citation></citation><citation key="ref18"><doi>10.1016/j.autcon.2012.12.005</doi><unstructured_citation>J. Irizarry and E.P. Jalaei,&quot; Integrating BIM and GIS to improve the visual monitoring of construction supply chain management,&quot; Automation in Construction, 2013, 241-254.</unstructured_citation></citation><citation key="ref19"><doi>10.1016/j.autcon.2012.11.041</doi><unstructured_citation>Changming Kim, Hyojoo Son, Changwan Kim, &quot;Automated construction progress measurement using a 4D building information model and 3D data&quot; Automation in construction 31 (2013) 75-82</unstructured_citation></citation><citation key="ref20"><unstructured_citation>V. Kolagotla,&quot; Geographic information system and its application to project management in construction industry,&quot; 10th ESRI India user Conference, 2009, 1-12.</unstructured_citation></citation><citation key="ref21"><doi>10.1155/2017/1048540</doi><unstructured_citation>A.C. Kumar and T. Reshma,&quot; 4D applications of GIS in construction management,&quot; Advances in Civil Engineering, Volume 2017, Article ID 1048540, 1-9.</unstructured_citation></citation><citation key="ref22"><doi>10.3923/rjasci.2012.222.228</doi><unstructured_citation>V.R. Kumar and T. Navneethakrishnan,&quot;4D model through GIS for planning and scheduling of residential construction projects,&quot; Research Journal of Applied Sciences, 2012, 7(4), 222-228.</unstructured_citation></citation><citation key="ref23"><unstructured_citation>R.A.R. Mansoori,&quot; Application of primavera &amp; GIS for effective project management,&quot; International Journal of Engineering Research, 2016, 5(1), 140-142.</unstructured_citation></citation><citation key="ref24"><doi>10.1061/40475(278)109</doi><unstructured_citation>O'Brien William, &quot;Towards 5D CAD-Dynamic Cost and Resource Planning for Specialist Contractors&quot; Construction Congress VI, Feb 20-22,2000</unstructured_citation></citation></citation_list>
</doi_citations>
</body>
</doi_batch>
