<?xml version="1.0" encoding="UTF-8"?>
<doi_batch version="4.3.0" xmlns="http://www.crossref.org/doi_resources_schema/4.3.0" xmlns:xsi="http://www.w3.org/2001/XMLSchema-instance" xsi:schemaLocation="http://www.crossref.org/doi_resources_schema/4.3.0 http://www.crossref.org/schema/deposit/doi_resources4.3.0.xsd">
<head>
<doi_batch_id>754081d4-aa56-45c7-b1a4-e38905306f4b</doi_batch_id>
<depositor>
<name>beie</name>
<email_address>director@blueeyesintelligence.org</email_address>
</depositor>
</head>
<body>
<doi_citations>
<doi>10.35940/ijitee.H9155.0711822</doi>
<citation_list><citation key="ref0"><unstructured_citation>Bengaluru Metro Rail: Silk Board - KR Puram Corridor, Detailed Project report (Oct 2016), Bangalore Metro Rail Corporation.</unstructured_citation></citation><citation key="ref1"><unstructured_citation>Debalina Banerjee, (2017) &quot;Risk analysis and decision support in transportation megaprojects&quot; International Journal of Civil Engineering and Technology, Vol.8 (7), 836-845.</unstructured_citation></citation><citation key="ref2"><unstructured_citation>Environmental Risk Assessment Report (Risk Register),(2016), Melbourne Metro Rail Authority, MMR-AJM-PWAA-RP-NN-000813, Reference CMS332569.</unstructured_citation></citation><citation key="ref3"><unstructured_citation>Environmental Impact Assessment, (2017), Bangalore Metro Rail Project - Line R6, Bangalore Metro Rail Corporation Limited.</unstructured_citation></citation><citation key="ref4"><unstructured_citation>ITA WG Mechanized Tunneling, (2000), &quot;Recommendations and Guidelines for Tunnel Boring Machines (TBMs)&quot;, International Tunneling Association (ITA), Mechanized tunneling,1-118, France.</unstructured_citation></citation><citation key="ref5"><doi>10.1063/1.5005730</doi><unstructured_citation>Lee Yong Siang, (2017) &quot;General Risks for Tunneling Projects: An Overview&quot; Research gate.</unstructured_citation></citation><citation key="ref6"><doi>10.1016/S0263-7863(03)00005-X</doi><unstructured_citation>Lyons, Terry and Skitmore, (2004) &quot;Project risk management in the Queensland engineering construction industry: a survey&quot;. International Journal of Project Management Vol. 22(1), 51-61. [CrossRef]</unstructured_citation></citation><citation key="ref7"><unstructured_citation>Nigel J. Smith and Tony Merna, (2006), &quot;Managing Risk in construction Projects&quot; Blackwell Publisher Inc, Malden, USA.</unstructured_citation></citation><citation key="ref8"><unstructured_citation>Risk Integration Management, (2016), &quot;Schedule Risk Analysis Process&quot;, https://www.riskinteg.com/KB/2_Schedule_Risk_Analysis/ 2_2_process.aspx#</unstructured_citation></citation><citation key="ref9"><doi>10.2991/aiie-15.2015.87</doi><unstructured_citation>S.P. Huang, M.L. Guo, (2015), &quot;Analysis and Strategies of the Common Tunnel Problems&quot; International Conference on Artificial Intelligence and Industrial Engineering, AIIE, China. [CrossRef]</unstructured_citation></citation></citation_list>
</doi_citations>
</body>
</doi_batch>
