<?xml version="1.0" encoding="UTF-8"?>
<doi_batch version="4.3.0" xmlns="http://www.crossref.org/doi_resources_schema/4.3.0" xmlns:xsi="http://www.w3.org/2001/XMLSchema-instance" xsi:schemaLocation="http://www.crossref.org/doi_resources_schema/4.3.0 http://www.crossref.org/schema/deposit/doi_resources4.3.0.xsd">
<head>
<doi_batch_id>c294a8eb-8075-48be-b21a-aae267394fca</doi_batch_id>
<depositor>
<name>beie</name>
<email_address>director@blueeyesintelligence.org</email_address>
</depositor>
</head>
<body>
<doi_citations>
<doi>10.35940/ijitee.L9750.11121223</doi>
<citation_list><citation key="ref0"><doi>10.1016/j.ssci.2016.11.008</doi><unstructured_citation>Amiri, M., Ardeshir, A., and Zarandi, M. Fuzzy Probabilistic Expert System for Occupational Hazard Assessment in Construction. Safety Science, Vol. 93, pp. 16-28. (2017). https://doi.org/10.1016/j.ssci.2016.11.008</unstructured_citation></citation><citation key="ref1"><unstructured_citation>Ahmed, M. (2014) Composite FMEA for Risk Assessment in the Construction Projects, Thesis Politecnico Di Milano. (2014).</unstructured_citation></citation><citation key="ref2"><doi>10.24200/sci.2016.2313</doi><unstructured_citation>Ardeshir, A., Mohajeri, M., and Amiri, M. Evaluation of safety risks in construction using Fuzzy Failure Mode and Effect Analysis (FFMEA). Scientia Iranica, Vol. 23 No. 6, pp. 2546-2556.‏ (2016). https://doi.org/10.24200/sci.2016.2313</unstructured_citation></citation><citation key="ref3"><doi>10.1016/j.sbspro.2012.04.050</doi><unstructured_citation>Bahrami, M., Bazzaz, D., and Saijadi, S. M. Innovation and Improvements In Project Implementation and Management; Using FMEA Technique. Procedia - Social and Behavioral Sciences, Vol. 41, pp. 418-425. (2012). https://doi.org/10.1016/j.sbspro.2012.04.050</unstructured_citation></citation><citation key="ref4"><unstructured_citation>Bongiorno, J. Use FMEAs to Improve Your Product Development Process. PM Network, pp. 47-51. (2004).</unstructured_citation></citation><citation key="ref5"><doi>10.1080/10429247.2004.11415263</doi><unstructured_citation>Carbone, T. A., and Tippett, D. D. Project Risk Management Using the Project Risk FMEA. Engineering Management Journal, Vol. 16 No. 4, pp. 28-35. (2004). https://doi.org/10.1080/10429247.2004.11415263</unstructured_citation></citation><citation key="ref6"><doi>10.1108/ECAM-10-2019-0535</doi><unstructured_citation>Karamoozian, A., and Wu, D. A Hybrid Risk Prioritization Approach in Construction Projects Using Failure Mode and Effective Analysis. Engineering, Construction and Architectural Management, Vol. 27 No. 9, pp. 2661-86. (2020). https://doi.org/10.1108/ECAM-10-2019-0535</unstructured_citation></citation><citation key="ref7"><doi>10.1016/j.asoc.2018.09.020</doi><unstructured_citation>Lo, H., and Liou, J. H. A Novel Multiple-Criteria Decision-Making-Based FMEA Model for Risk Assessment. Applied Soft Computing, Vol. 73, pp. 684-96. (2018). https://doi.org/10.1016/j.asoc.2018.09.020</unstructured_citation></citation><citation key="ref8"><unstructured_citation>Razaque, A., and Bach, C. (2012). Fostering Project Scheduling and Controlling Risk Management. International Journal of Business and Social Science, Vol. 3 No. 14, pp. 118-27. (2012).</unstructured_citation></citation><citation key="ref9"><doi>10.1080/15623599.2020.1742634</doi><unstructured_citation>Sarkar, D., and Manvinder, S. Risk Analysis by Integrated Fuzzy Expected Value Method and Fuzzy Failure Mode and Effect Analysis for an Elevated Metro Rail Project of Ahmedabad, India. International Journal of Construction Management, Vol. 22, No. 10, pp. 1818-29. (2022). https://doi.org/10.1080/15623599.2020.1742634</unstructured_citation></citation><citation key="ref10"><doi>10.1108/02656711011062417</doi><unstructured_citation>Sawhney, R., Subburaman, K., Sonntag, C., Rao, V., and Capizzi, C. A Modified FMEA Approach to Enhance Reliability of Lean Systems. International Journal of Quality &amp; Reliability Management, Vol. 27 No. 7, pp. 832-55. (2010). https://doi.org/10.1108/02656711011062417</unstructured_citation></citation><citation key="ref11"><doi>10.1080/09537325.2013.774343</doi><unstructured_citation>Shen, X, Jiang, S, gong, L &amp; Carr, C. Technology Progress in the Chinese Construction Industry under the Iron-Fist of Government, Technology Analysis and Strategic Management, vol. 25, no. 4, pp. 387. (2013). 402. https://doi.org/10.1080/09537325.2013.774343</unstructured_citation></citation><citation key="ref12"><unstructured_citation>Soebandrija, K. E. N., Suharjanto, G., Selvi, G. V., and Darmawan, R. Failure Modes and Effects Analysis (FMEA) in Indonesia's Construction Project through Lens of Improvement and Decision-Making Strategy. Proceedings of the First Australian International Conference on Industrial Engineering and Operations Management, IEOM Society International. (2022).</unstructured_citation></citation><citation key="ref13"><doi>10.1088/1757-899X/528/1/012027</doi><unstructured_citation>Suryoputro, M. R., Khairizzahra, A. D. S., and Widiatmaka, N. W. Failure Mode and Effect Analysis (Fuzzy FMEA) Implementation for Forklift Risk Management in Manufacturing Company. IOP Conf. Ser.: Mater. Sci. Eng (2019). https://doi.org/10.1088/1757-899X/528/1/012027</unstructured_citation></citation><citation key="ref14"><unstructured_citation>Spencer, L., Ritchie, J., Lewis, J., and Dillon, L. Quality in Qualitative Evaluation: A Framework for Assessing Research Evidence. National Centre for Social Research. (2003).</unstructured_citation></citation><citation key="ref15"><unstructured_citation>Tafazzoli, M. Dynamic Risk Analysis of Construction Delays Using Fuzzy-Failure Mode Effects Analysis. University of Nevada. (2017).</unstructured_citation></citation><citation key="ref16"><doi>10.1088/1755-1315/330/2/022041</doi><unstructured_citation>Wang, R., Feng, Y., and Yang, H. Construction Project Risk Evaluation Based on FMEA. Earth and Environmental Science, Vol. 330 No. 2. (2019). https://doi.org/10.1088/1755-1315/330/2/022041</unstructured_citation></citation><citation key="ref17"><unstructured_citation>Wehbe, F. A., and Hamzeh, F. R. Failure Mode and Effect Analysis as a Tool for Risk Management in Construction Planning. Production System Design. (2013).</unstructured_citation></citation><citation key="ref18"><doi>10.35940/ijrte.C4919.098319</doi><unstructured_citation>Rauf*, H. L., Shareef, S. S., &amp; Ukabi, E. (2019). Understanding the Relationship between Construction Courses and Design in Architectural Education. In International Journal of Recent Technology and Engineering (IJRTE) (Vol. 8, Issue 3, pp. 3201-3207). https://doi.org/10.35940/ijrte.c4919.098319.</unstructured_citation></citation><citation key="ref19"><doi>10.54105/ijse.C3979.053123</doi><unstructured_citation>Kebede, T. (2023). Parametric Stability Analysis of a Thin Shell Structure Under Own Weight. In Indian Journal of Structure Engineering (Vol. 3, Issue 1, pp. 7-13). https://doi.org/10.54105/ijse.c3979.053123</unstructured_citation></citation><citation key="ref20"><doi>10.35940/ijitee.I8937.078919</doi><unstructured_citation>Mohanty, S., Roy, S., Ganguly, M., &amp; Pattnaik, P. K. (2019). Risk Assessment for Project Construction Based on User Perspective: An Experimental Analysis using AHP. In International Journal of Innovative Technology and Exploring Engineering (Vol. 8, Issue 9, pp. 2944-2952). https://doi.org/10.35940/ijitee.i8937.078919</unstructured_citation></citation><citation key="ref21"><doi>10.35940/ijisme.D1188.016420</doi><unstructured_citation>Priya, Dr. R. (2020). The Estimation of Risk on Cloud Computing Framework. In International Journal of Innovative Science and Modern Engineering (Vol. 6, Issue 4, pp. 5-10). https://doi.org/10.35940/ijisme.d1188.016420</unstructured_citation></citation><citation key="ref22"><doi>10.35940/ijeat.A1752.1010120</doi><unstructured_citation>Raja, A. K. A., Geethan, K. A. V., Tamilarasan, G., Shanoffer, S. J., &amp; Rathish, S. (2020). Development and Characterisation of Banana and E Glass Fiber Reinforced With Isophthalic Resin Based Composites. In International Journal of Engineering and Advanced Technology (Vol. 10, Issue 1, pp. 129-133). https://doi.org/10.35940/ijeat.a1752.1010120</unstructured_citation></citation></citation_list>
</doi_citations>
</body>
</doi_batch>
